In the fall of 2018 we began work at the Windy Peak Outdoor School. This project included 3 high level treatment units each with a 2000 G.P.D design flow. It was an awesome experience to work in the beautiful Mountains
On this project we installed 80,000 gallons of fire cistern storage, hydrants and a 2000 gallon per day septic system located beneath parking.
This project was a replacement Leach field for the cabins at Devils Thumb Ranch.
This system was designed and installed with preservation of natural resources and landscapes at top priority. With 9000 ft of drip tubing, and advanced treatment it is truly a environment friendly system.
This music center, located at the base of longs peak,required over 2000 ft of collection piping and a sand filter in the leach area.
2000 GPD design flow makes for a huge system!