This project was a replacement Leach field for the cabins at Devils Thumb Ranch.
This system was designed and installed with preservation of natural resources and landscapes at top priority. With 9000 ft of drip tubing, and advanced treatment it is truly a environment friendly system.
This music center, located at the base of longs peak,required over 2000 ft of collection piping and a sand filter in the leach area.